Skip to content. | Skip to navigation

Заедничка Акција за Одржлива Иднина
Veprojmë së bashku për një të ardhme të qëndrueshme
Zajednička akcija za održivu budućnost
Συντονισμένη Δράση για ένα Βιώσιμο Μέλλον
Coordinated Action for a Sustainable Future

Personal tools

You are here: Home / GEF Drin Project / Project Components

Project Components

 

The Project is structured around 5 Components that are further detailed in 7 outcomes and 13 outputs.

COMPONENT

OUTCOME

OUTPUT

Component 1. Consolidating a Common Knowledge Base.

Outcome 1: Consensus Among Countries on Key Transboundary Concerns, Including Climate Change and Variability, Reached Through Joint Fact Finding.

Output 1. Transboundary Diagnostic Analysis (TDA).

Output 2. Agreement on main drivers of change, and on indicators of current conditions, documented and agreed by the Drin Core Group.

Output 3. Monitoring and Information Management System (IMS).

Component 2. Building the Foundation for Multi-Country Cooperation.

Outcome 2: Visioning Process Opens the Way for Systematic Cooperation in the Management of the Transboundary Drin River Basin.

Output 4. Shared Vision (horizon of 20 years).

Output 5. Strategic Action Program (SAP) with a 5 years’ time horizon and consistent with the Shared Vision formulated.

Outcome 3: Countries and Donors Commit to Sustain Joint Cooperation Mechanisms and to Undertake Priority Reforms and Investments.

Output 6. Partnership Conference.

Component 3. Institutional Strengthening for Integrated River Basin Management (IRBM).

Outcome 4: The Operationalization and Strengthening of the Institutional and Legal Frameworks for Transboundary Cooperation will Facilitate Balancing of Water Uses and Sustaining Environmental Quality throughout the Extended Drin Basin.

Output 7.  High Level Joint Commission for the extended Drin Basin established.

Output 8. Inter-ministerial Committees established and functioning.

Output 9. SAP adopted at the Ministerial level by the Meeting of the Parties to the Drin MoU.

Output 10. Training program.

Component 4. Demonstration of Technologies and Practices for IWRM and Ecosystem Management.

Outcome 5: Benefits Demonstrated on the Ground by Environmentally Sound Approaches and Technologies New to the Region.

Output 11. A program of on the ground pilot demonstrations will deliver tangible results using quantifiable indicators.

Component 5. Stakeholder Involvement, Gender Mainstreaming and Communication.

Outcome 6: Public Support and Participation to IWRM and Joint Multi-Country Management Enhanced Through Stakeholder Involvement and Gender Mainstreaming. 

Output 12. A Stakeholder Involvement and Gender Mainstreaming Strategy defined and implemented.

Outcome 7: Political Awareness at All Levels and Private Sector Participation Strengthened through Higher Visibility of the Project’s Developments and Targeted Outreach Initiatives.

Output 13. Information, Communication and Outreach Strategy prepared and implemented.

News & Announcements
Mekong Study Visit for Drin Delegation
Journalists gather in Ohrid for Training in Environmental Reporting
Drin Core Group request establishment of Drin Commission
Minister for Environment and Spatial Planning, Kosovo, attends 17th Drin Core Group Meeting
Expert Working Groups meet to review Strategic Action Programme
GEF Drin Project Team presents Project highlights to the Albanian Water Resources Management Agency
6th Drin Day Celebrations - Plastic Pollution
Drin Basin Experts meet to review Draft Strategic Action Programme
Biomass Pilot Activity in National Park of Skadar Lake reaches Second Phase following equipment donation
Focus Group Meetings to discuss Strategic Action Programme for Drin Basin
Riparian Experts conduct ‘Causal Chain Analysis’ paving the way for a Strategic Action Plan in extended Drin River Basin
Drin River Basin pioneers new approaches to water management
First Constructed Wetland in Kosovo set to reduce sewage pollution in White Drin
Mayors of Pogradec and Ohrid agree on missing link for Lake Ohrid future
Podgorica Drin Stakeholders Conference: Progress towards the sustainable management of the Drin Basin
Activities for the management of Skadar Lake vegetation in Montenegro through biomass collection and production of fuel briquettes have been initiated.
Pristina Drin Stakeholders Conference: A great Momentum for the Process towards Enhanced Transboundary Cooperation for the Basin’s Management
Building Drin Riparians’ Capacities on Transboundary Water Cooperation and International Water Law
The GEF Drin Project: Contributing in the 30th Session of the Montenegrin National Council for Sustainable Development, Climate Change and Integrated Coastal Zone Management
Raising awareness among local communities on the importance of sustainable management for the Drin River Basin
A new Impetus for Enhancing Cooperation for the Management of the Drin Basin
News & Announcements - More…
This is Domino Theme